BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Snake River Alliance - ECPv6.18.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Snake River Alliance
X-ORIGINAL-URL:https://snakeriveralliance.org
X-WR-CALDESC:Events for Snake River Alliance
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Boise
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20220313T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20221106T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20230312T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20231105T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20240310T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20241103T080000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20250309T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20251102T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Boise:20231108T160000
DTEND;TZID=America/Boise:20231108T190000
DTSTAMP:20231103T170206Z
CREATED:20231103T170039Z
LAST-MODIFIED:20231103T170206Z
UID:10000065-1699459200-1699470000@snakeriveralliance.org
SUMMARY:Speak Out for Energy Independence Twin Falls!
DESCRIPTION:Tell the Idaho Public Utilities Commission to back Idahoans and stop Idaho Power from eclipsing solar!
URL:https://snakeriveralliance.org/event/speak-out-for-energy-independence-twin-falls/
LOCATION:American Legion\, 447 Seastrom St\, Twin Falls\, ID
CATEGORIES:Comments
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/Boise:20240617T170000
DTEND;TZID=America/Boise:20240617T200000
DTSTAMP:20240607T194445Z
CREATED:20240607T194431Z
LAST-MODIFIED:20240607T194445Z
UID:10000070-1718643600-1718654400@snakeriveralliance.org
SUMMARY:Rooftop Solar Hearing in Idaho Falls
DESCRIPTION:Rocky Mountain Power Threatens Idaho’s Solar Power!\nPublic Hearing: Voice your concerns and tell the Idaho PUC to Reject Rocky Mountain Power’s Solar Study! \nRocky Mountain Power is pushing a plan to slash compensation rates for rooftop solar owners. This plan mirrors one they successfully lobbied for in Utah\, and aims to follow in Idaho Power’s footsteps to get the PUC to approve a bad “value of solar study.” This could significantly increase the bills for Idaho residents with solar. While attacking solar and energy democracy\, RMP wants to expand\, gas\, continue burning coal\, and sprinkle that with dangerous\, expensive nuclear energy!  Here’s the dirty deal: \n\nRocky Mountain Power wants the Idaho Public Utilities Commission (PUC) to approve a misleading “value of solar study.”\nBased on this potentially flawed study\, they’ll then seek to reduce the amount homeowners are paid for the clean\, renewable energy their solar panels generate.\nThis is bad news for Idaho’s environment and your wallet. Over 2\,000 residents in the Rocky Mountain Power service area already enjoy the benefits of solar\, and this move could discourage others from following suit.\n\nThanks to the Idaho Sierra Club for the graphic\, info\, and comment portal! \nPlease share with your networks in eastern Idaho.
URL:https://snakeriveralliance.org/event/rooftop-solar-hearing/
LOCATION:Idaho Falls Activity Center\, South Room\, 1575 N Skyline Dr\, Idaho Falls\, ID\, 83402
CATEGORIES:Comments
ATTACH;FMTTYPE=image/png:https://snakeriveralliance.org/wp-content/uploads/2024/06/RMPsolarcomments.png
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20240812
DTEND;VALUE=DATE:20240813
DTSTAMP:20240621T231004Z
CREATED:20240621T230745Z
LAST-MODIFIED:20240621T231004Z
UID:10000072-1723420800-1723507199@snakeriveralliance.org
SUMMARY:NRC Seeking Public Comment on Environmental Review of TerraPower Construction Permit Application
DESCRIPTION:Nuclear Regulatory Commission – News Release \nNo: 24-045 June 12\, 2024 \nCONTACT: Scott Burnell\, 301-415-8200 \nThe Nuclear Regulatory Commission is seeking public input on the environmental review process for the construction permit application from TerraPower\, which seeks permission to build the company’s Natrium nuclear power plant near Kemmerer\, Wyoming. \nNRC staff members will be in Kemmerer July 16 to describe the environmental review process and gather comments on the issues that should be addressed in the review. Details for the day’s agenda are being finalized and will be available by June 25 on the TerraPower application page and the NRC’s Public Meeting Schedule. \nTerraPower\, through its subsidiary US SFR Owner\, filed the application in March\, requesting a permit to build the sodium-cooled\, advanced reactor design on a site near an existing coal-fired power plant. The 345-megawatt electric Natrium plant includes an energy storage system to temporarily boost output up to 500 MWe\, when needed. If the NRC ultimately issues the permit\, TerraPower would need to submit a separate operating license application. \nThe NRC offers several methods for filing comments on the environmental review before the Aug. 12 deadline\, as outlined in a Federal Register notice. Comments can also be submitted via regulations.gov under Docket ID NRC-2024-0078\, via email to TerraPowerEnvironmental@nrc.gov or via mail to Office of Administration\, Mail Stop TWFN-7-A60M\, U.S. Nuclear Regulatory Commission\, Washington\, DC 20555-0001. \nA copy of the TerraPower construction permit application\, including the environmental report\, is available at the Lincoln County Library\, 519 Emerald St. in Kemmerer. \n### \nThe Snake River Alliance will work with our allies analyzing the Environmental Review and provide key points for you to use in your comments at a later time.
URL:https://snakeriveralliance.org/event/nrc-seeking-comment-on-terrapower-construction/
CATEGORIES:Public Comment
END:VEVENT
END:VCALENDAR